Siphonic Drainage for Dexcom Facility
Siphonic solution replaced gravity drainage in this pharmaceutical facility reducing risk around critical services and minimising below-ground drainage requirements.
Siphonic solution replaced gravity drainage in this pharmaceutical facility reducing risk around critical services and minimising below-ground drainage requirements.
How Capcon is addressing the challenges of ageing drainage infrastructure. Capcon Engineering, a leader in the design and installation of rainwater drainage systems, is seeing
Malaysia Data Centre The implementation of siphonic drainage at this Johor data centre not only ensures rapid rainwater removal but also provides superior protection against
We’re hiring! The Project Planner/Scheduler is responsible for the detailed planning, scheduling, and coordination of all project activities from pre-construction through to project completion.
Berlin Data Centre Data hall space is maximised by switching from a pitch roof with traditional external gravity drainage to a flat roof and siphonic
Capcon Engineering is excited to announce a significant new addition to our team! We are pleased to welcome Julia Cavanaugh, who has joined us as
G2, Maynooth Business Campus, Straffan Rd, Maynooth, Co. Kildare, Ireland, W23 V6K3
Endeavour House 3rd Floor, Coopers End Road, Stansted, United Kingdom, CM24 1SJ
Unit 1203 Level 12, Uptown 1,
No. 1, Jalan SS 21/58, Damansara Utama,
47400 Petaling Jaya, Selangor, Malaysia
© Capcon Engineering – 2024 – All rights reserved
We use cookies to optimise our website and our service.