-
ProjectCapital Building, Grand Parade, Cork
-
ClientJohn Cleary Developments
-
ContractorBAM
-
ArchitectWilson Architecture
-
TechnologySiphonic System
-
ScopeDesign, Off-site prefabrication, Installation
The Capitol will combine a major retail destination with world class Gold LEED offices in the heart of Cork City Centre. This is a site steeped in history so heritage and innovation both played a big part in the development and the close connection to the English Market was being respected through the Food Innovation Centre adjacent to the market. The project also involves the fondly remembered and iconic Oyster Tavern, established in the 1800s being restored to its former glory with an upmarket restaurant and bar, with produce sourced from the neighbouring English Market.
Capcon Engineering’s role in this project included;
Design, pre-fabrication and installation of the Siphonic Drainage and insulation Systems
Capcon Engineering’s skilled Designers designed & pre-fabricated the new Siphonic Drainage Systems at The Capital Building using our in-house design capabilities.