Siphonic for Amazon Project in Southwest England
TSL Projects engaged Capcon Engineering to design, supply, prefabricate and install a highly efficient roof drainage system for a 10,000m² data centre for their client, Amazon.
TSL Projects engaged Capcon Engineering to design, supply, prefabricate and install a highly efficient roof drainage system for a 10,000m² data centre for their client, Amazon.
The UK’s first electric forecourt was opened by Gridserve Braintree, Essex in December 2020. Capcon were contracted by ESS Modular to provide a siphonic drainage solution for the modular build.
Our LIVE Webinar CPD “Introduction to Siphonic Drainage” is happening on the 18th November at 1pm. Register today!
Clerys Quarter, a mixed-use development off O’Connell St in Dublin city centre, is scheduled to open to the public in late 2022.
We are recruiting for a Workshop Fabrication Manager. Contact us to apply.
Capcon were contracted very late in the project after the previous contractor withdrew mid-project. This created several challenges that required immediate resolution to ensure program delivery was achieved on time.
G2, Maynooth Business Campus, Straffan Rd, Maynooth, Co. Kildare, Ireland, W23 V6K3
Endeavour House 3rd Floor, Coopers End Road, Stansted, United Kingdom, CM24 1SJ
Unit 1203 Level 12, Uptown 1,
No. 1, Jalan SS 21/58, Damansara Utama,
47400 Petaling Jaya, Selangor, Malaysia
© Capcon Engineering – 2024 – All rights reserved