Amazon Warehouse Facility
-
ClientAmazon
-
ContractorISG
-
ArchitectJSA Architects
-
TechnologyPrimary & Secondary Siphonic Drainage
-
ScopeDesign, Pre-fabrication, Installation & Certification
Design Brief
Capcon Engineering was engaged by ISB to design, supply, fabricate and install the primary and secondary siphonic drainage on for Amazon’s warehouse facility in Dublin.
The programme required an aggressive installation period which Capcon managed successfully; all pipework was installed within the program windows allocated to us.
-
2000m of Pipework2000m of pipe work designed, prefabricated & installed
-
€250K ValueCapcon Engineering project value
-
4 MonthsDuration of project