Rethinking Rainwater Management for the RDS Anglesea Stand
The benefits of an advanced siphonic drainage solution The RDS Anglesea Stand is a state-of-the-art upgrade for Leinster Rugby in Dublin, designed to accommodate 6,775
The benefits of an advanced siphonic drainage solution The RDS Anglesea Stand is a state-of-the-art upgrade for Leinster Rugby in Dublin, designed to accommodate 6,775

For a significant pharmaceutical project in Singapore, PM Group enlisted the expertise of Capcon Engineering to design a high-performance rainwater drainage system that could handle the island’s intense tropical climate.
Data centres form the backbone of modern digital infrastructure, supporting everything from cloud computing to artificial intelligence (AI). However, their continued maintenance requires vast resources.
A large-scale tile factory in Sittingbourne, Kent Our recent project with Toureen Group—a large-scale tile factory in Sittingbourne, Kent—provided the perfect opportunity to showcase our
The redevelopment of Connacht Rugby’s Dexcom Stadium in Galway The redevelopment of Connacht Rugby’s Dexcom Stadium in Galway represents a transformative project designed to elevate
Restoring Functionality to the St. Regis School Roof in Bognor Regis Maintaining the integrity of roofing systems is critical to ensuring the longevity of any
Water is one of the most valuable resources in urban infrastructure, shaping how cities grow and adapt to evolving environmental conditions. As rainfall patterns shift
Project Oriel is a state-of-the-art hospital development located in the heart of London, adjacent to St. Pancras Station. This ambitious project is being delivered for Bouygues, a leading French building contractor with whom Capcon has a strong, established relationship.
Sustainability in Rainwater Management As challenges surrounding climate change and increasing construction demands intensify, the need for sustainable infrastructure has become a global priority. Commercial
Restoring Functionality and Efficiency When ALPLA’s manufacturing plant in Milton Keynes faced persistent roof performance issues, our team was engaged to provide a comprehensive, technically
2-4 Wilton Place, Dublin The commercial development at 2-4 Wilton Place, Dublin, was an opportunity for Capcon Engineering to deliver a technically demanding project in
Capcon Engineering was called in to resolve severe winter drainage failures at a Nordic data centre, ensuring robust, climate-resilient protection for this critical facility.
We use cookies to optimise our website and our service.