Optimising Drainage Systems to Protect Infrastructure at -35°C
Capcon Engineering was called in to resolve severe winter drainage failures at a Nordic data centre, ensuring robust, climate-resilient protection for this critical facility.
Capcon Engineering was called in to resolve severe winter drainage failures at a Nordic data centre, ensuring robust, climate-resilient protection for this critical facility.
Capcon Engineering was engaged by a consulting engineer on a Milan Data Centre project late in the RIBA stage 3 design phase.

Siphonic solution replaced gravity drainage in this pharmaceutical facility reducing risk around critical services and minimising below-ground drainage requirements.

Malaysia Data Centre The implementation of siphonic drainage at this Johor data centre not only ensures rapid rainwater removal but also provides superior protection against

Berlin Data Centre Data hall space is maximised by switching from a pitch roof with traditional external gravity drainage to a flat roof and siphonic

K2 Dublin Data Centre Project K2 Dublin Data Centre Client AC Plc Design Team RKD Technology Siphonic and Gravity Scope Design, off-site fabrication, Installation AC

TSL Projects engaged Capcon Engineering to design, supply, prefabricate and install a highly efficient roof drainage system for a 10,000m² data centre for their client, Amazon.

Capcon Engineering has recently completed a significant gravity drainage project in a new Dublin data centre for a large multi-national client.
We use cookies to optimise our website and our service.