Clerys Quarter, a mixed-use development off O’Connell St in Dublin city centre, is scheduled to open to the public in late 2022.
We are recruiting for a Workshop Fabrication Manager. Contact us to apply.
Capcon were contracted very late in the project after the previous contractor withdrew mid-project. This created several challenges that required immediate resolution to ensure program delivery was achieved on time.
What should we be aware of when breaking the siphonic action prior to the Rainwater Drainage termination point?
Design of siphonic and gravity rainwater drainage system for Charlemont Square, followed by prefabrication, installation, testing and commissioning.
G2, Maynooth Business Campus, Straffan Rd, Maynooth, Co. Kildare, Ireland, W23 V6K3
Endeavour House 3rd Floor, Coopers End Road, Stansted, United Kingdom, CM24 1SJ
Unit 1203 Level 12, Uptown 1,
No. 1, Jalan SS 21/58, Damansara Utama,
47400 Petaling Jaya, Selangor, Malaysia
© Capcon Engineering – 2024 – All rights reserved
We use cookies to optimise our website and our service.