Optimising Drainage Systems to Protect Infrastructure at -35°C
Siphonic solution replaced gravity drainage in this pharmaceutical facility reducing risk around critical services and minimising below-ground drainage requirements.
Siphonic solution replaced gravity drainage in this pharmaceutical facility reducing risk around critical services and minimising below-ground drainage requirements.
Siphonic solution replaced gravity drainage in this pharmaceutical facility reducing risk around critical services and minimising below-ground drainage requirements.
Siphonic solution replaced gravity drainage in this pharmaceutical facility reducing risk around critical services and minimising below-ground drainage requirements.
Malaysia Data Centre The implementation of siphonic drainage at this Johor data centre not only ensures rapid rainwater removal but also provides superior protection against
Berlin Data Centre Data hall space is maximised by switching from a pitch roof with traditional external gravity drainage to a flat roof and siphonic
K2 Dublin Data Centre Project K2 Dublin Data Centre Client AC Plc Design Team RKD Technology Siphonic and Gravity Scope Design, off-site fabrication, Installation AC
For a significant pharmaceutical project in Singapore, PM Group enlisted the expertise of Capcon Engineering to design a high-performance rainwater drainage system that could handle the island’s intense tropical climate.
Project delivery experts PM Group approached Capcon Engineering to design the rainwater drainage systems for a major vaccine facility in France.
TSL Projects engaged Capcon Engineering to design, supply, prefabricate and install a highly efficient roof drainage system for a 10,000m² data centre for their client, Amazon.
The UK’s first electric forecourt was opened by Gridserve Braintree, Essex in December 2020. Capcon were contracted by ESS Modular to provide a siphonic drainage solution for the modular build.
Clerys Quarter, a mixed-use development off O’Connell St in Dublin city centre, is scheduled to open to the public in late 2022.
Capcon were contracted very late in the project after the previous contractor withdrew mid-project. This created several challenges that required immediate resolution to ensure program delivery was achieved on time.
G2, Maynooth Business Campus, Straffan Rd, Maynooth, Co. Kildare, Ireland, W23 V6K3
Endeavour House 3rd Floor, Coopers End Road, Stansted, United Kingdom, CM24 1SJ
Unit 1203 Level 12, Uptown 1,
No. 1, Jalan SS 21/58, Damansara Utama,
47400 Petaling Jaya, Selangor, Malaysia
© Capcon Engineering – 2024 – All rights reserved
We use cookies to optimise our website and our service.