Pre-Fabrication & Installation of the Siphonic Drainage System.
ARCHITECT:
Atkins
MAIN CONTRACTOR:
Volker Fitzpatrick / Kilnbridge Construction Services Ltd
DESCRIPTION:
Cambridge North Rail Station was opened for commuters on the 21st May 2017. The Station is attracting more than just commuters however as people are drawn to the unique design of the building which contains a pattern in the metal cladding based on the mathematical theory from “the game of life” by Cambridge mathematician John Conway. Work commenced on this project in 2015 at a total cost of £50M.
SOLUTION:
CapCon Engineering’s Role in this project included; Design, Pre-Fabrication & Installation of the Siphonic Drainage System.
CapCon Engineering’s skilled staff designed, pre-fabricated & installed the Siphonic Drainage Systems at Cambridge North Station.